Planning, explained straight
No content-mill filler: every guide states the actual rules with their sources, publishes costs as ranges calibrated against real London project data, and links to the live data that answers the address-level questions. Where a rule has an exception, the exception is in the guide.
Almost every London extension, loft and basement engages this Act. Here's how it actually works.
Read the guide →If your home is listed, planning permission is only half the story.
Read the guide →Your lease is a contract — and the council was never the only gatekeeper.
Read the guide →Permitted development is a houses-only system. If you own a flat, the rules — and the consents — are different.
Read the guide →Two separate approval systems. Confusing them is the most common — and most expensive — mistake in domestic building.
Read the guide →Building regulations are a separate system from planning — and the certificate at the end is the one your buyer's solicitor will ask for.
Read the guide →The right people, in the right order. Most overspend starts with hiring the wrong one — or hiring them too late.
Read the guide →Most expensive mistakes aren't bad decisions — they're the right ones made in the wrong order. Here's the sequence, start to finish.
Read the guide →The size limits, the exceptions, and the postcode-level traps.
Read the guide →Bigger single-storey rear extensions without a full planning application — but it's a notification process, not a free pass.
Read the guide →Real ranges from real projects — not brochure numbers.
Read the guide →40 cubic metres of opportunity — unless your street says otherwise.
Read the guide →Four roof forms, four budgets — and one big conservation premium.
Read the guide →VAT is the quiet 20% on top of almost everything — and the loft-conversion zero-rating myth is the one that wrecks budgets.
Read the guide →The value isn't a single price — it's the range, and the red flag. Expect £X–£Y; a quote far below the field almost always excludes something.
Read the guide →Designated land edits the rulebook — here's the exact redline.
Read the guide →Permitted development is only worth anything if you can prove it. A lawful development certificate is that proof.
Read the guide →Built without permission? The enforcement timeline changed fundamentally in 2024 — and most advice online is still wrong about it.
Read the guide →The designation nobody's heard of until it refuses their extension.
Read the guide →The C3-to-C4 shortcut is gone across much of London — check the borough, then the address.
Read the guide →Sixty seconds of checking saves weeks of redesign.
Read the guide →No permission needed — provided you respect five precise rules.
Read the guide →The biggest space gain in London — bought at the steepest price.
Read the guide →Most home extensions pay no CIL. The ones that do almost always do so because of a missed form, not a real bill.
Read the guide →The public record is your best planning consultant — if you can read it.
Read the guide →A refusal is a set of reasons, not a full stop. The reasons tell you which of three routes to take.
Read the guide →Find out what you can build before you commit, not after.
Read the guide →