Rear extension in Greenwich

Planning permission, real costs and what actually gets approved

Do you need planning permission for a rear extension in Greenwich?

Outside the conservation areas, much of the Victorian and interwar stock in Charlton, Eltham and Plumstead keeps permitted development rights for a single-storey rear extension within the limits, or larger via prior approval, to the Residential Extensions, Basements and Conversions SPD. Inside a conservation area — or where a householder Article 4 applies — expect a full application. Listed buildings in the historic core need listed building consent as well.

Charlton, Eltham and Plumstead terraces extend under PD; the Greenwich, Blackheath and Westcombe Park conservation areas need a full application.

The Royal Borough holds a major heritage core around Maritime Greenwich and a string of conservation areas, with listed buildings common in the historic town. Beyond those protected pockets, ordinary terrace and suburban stock still supports everyday rear extensions. The SPD sets design expectations in and out of conservation areas; riverside and park settings can add landscape scrutiny on prominent plots.

CHECK

What actually applies in Greenwich

Conservation areas in Greenwich

Real · planning.data.gov.uk

14 designated areas are recorded in the official dataset for this borough without published names. The area report still checks an address against their real boundaries — see the council's own conservation-area and Article 4 pages for the named schedules.

Source: planning.data.gov.uk · Open Government Licence · 14 recorded.

Article 4 directions in Greenwich

Real · planning.data.gov.uk

No Article 4 geometry for Greenwich appears in the national planning.data.gov.uk dataset, but the Royal Borough operates householder Article 4 directions in a number of its conservation areas — among them the Ashburnham Triangle, West Greenwich, East Greenwich, the Rectory Field, the Shrewsbury Park Estate and the Progress Estate — removing permitted development rights so that visible external alterations need planning permission. The Residential Extensions, Basements and Conversions Guidance SPD sets the design rules. Check the council's Article 4 pages for the position at a specific address.

Source: planning.data.gov.uk · Open Government Licence. Checked at address level by the area report.

Average house price
£459,985
Annual change
-2.6%

Prices: HM Land Registry UK House Price Index, December 2025 · Open Government Licence.

How often Greenwich grants householder applications: 77.6% of householder applications decided were granted (502 of 647) over 2025 Q2 to 2026 Q1 — rank 3 of 33 for lowest grant rate. London average: 85.6%. Householder applications are the class most rear extensions fall under. See the full householder approval-rate league table →
ROUTE

The planning route — PD or permission?

Permitted development (GPDO Class A) covers single-storey rear extensions up to 3m beyond the original rear wall on attached houses and 4m on detached, with a maximum height of 4m. The 'larger home extension' route extends this to 6m/8m through prior approval with neighbour consultation — but that larger route is not available in conservation areas.

In conservation areas, the basic 3m/4m single-storey rear PD allowance usually survives — what conservation-area status removes is side extensions and two-storey rear extensions. An Article 4 direction can remove more, but Camden's directions in Hampstead and Belsize target front-and-side appearance (solar panels, window changes, boundary treatments), not the single-storey rear allowance. Flats have no PD rights at all. Two-storey rear extensions in conservation areas always need full permission.

Practical rule across London: check the address first. If a conservation area or Article 4 direction applies, budget for a full householder application decided on design, neighbour daylight (the 45-degree test) and materials.

LIMITS

Permitted development limits — rear extension

Single-storey rear depth — attached house3m beyond the original rear wall
Single-storey rear depth — detached house4m beyond the original rear wall
Larger extension via prior approval6m attached / 8m detached — not in conservation areas
Maximum height (single storey)4m
Two-storey rear in a conservation areaFull planning permission required
FlatsNo permitted development rights

Limits summarise the General Permitted Development Order (Schedule 2, Part 1) as it applies in London. In Greenwich, a conservation area, Article 4 direction or listed status changes the route — the panels above show what is designated, and the address check confirms what applies at your property.

COST

How much does a rear extension cost in Greenwich?

Cost per m² (low — straightforward site)£3,000
Cost per m² (expected)£3,800
Cost per m² (high — conservation spec, hard access)£4,600+
Typical build cost (12–18m² single storey)£36,000 – £83,000
Professional fees, surveys, party wall (add)10–18% of build

Indicative London ranges calibrated from real project data. Conservation-area specifications (matching stock brick, lime mortar, bespoke glazing) and restricted rear access are the two biggest cost drivers. VAT not included.

TIME

Realistic timeline

Design and drawings4–8 weeks
Planning decision (full application)8–12 weeks (8-week statutory target)
Prior approval route, where available42 days
Party wall agreements4–10 weeks (parallel)
Build3–5 months
WATCH

What catches people out in Greenwich

Starting design before checking conservation, Article 4 and listing status is the classic false start near the heritage core. National geometry does not currently hold the borough's Article 4 directions — confirm those on the council's pages as well.

DISTRICTS

Postcode districts in Greenwich

FAQ

Rear extension in Greenwich, asked straight

01

Do I need planning permission for a rear extension in Greenwich?

Outside conservation areas, many houses can use permitted development or prior approval. Inside a conservation area or householder Article 4 street, expect a full application under the Residential Extensions, Basements and Conversions SPD.
02

How much does a rear extension cost in Greenwich?

Budget £3,000–£4,600+ per m², or roughly £36,000–£83,000 for a typical 12–18m² single-storey scheme, before VAT and 10–18% fees.
03

Will I need listed building consent?

Possibly in the historic core and World Heritage setting, where listed buildings are concentrated. Unauthorised works to a listed building are a criminal offence — check first.
04

Why might the free area report miss Article 4s?

No Article 4 geometry for Greenwich appears in the national planning.data.gov.uk dataset, even though the borough operates householder directions in several conservation areas. Confirm on the council's pages.
05

Do I need a party wall agreement?

Almost always on terraced and semi-detached houses when foundations or the structure affect a shared wall.
CHECK

What applies at your address?

Borough-level rules only narrow it down. Enter a Greenwich postcode for the live constraint check — conservation area, Article 4 and sold-price comparables, cited to source.

Need it in writing for one address? A planning permission report for a Greenwich property — from £59, or surveyor-reviewed from £295.

Planning Permission Checker provides planning and cost intelligence for early feasibility only. It is not legal, planning, valuation, architectural, structural, or surveying advice. All estimates are indicative and must be verified by qualified professionals before purchase, design, planning submission, or construction.

Cost estimates are indicative only — not a quotation. Final price depends on survey, specification, structure, access, party wall matters, VAT, professional fees, and contractor availability.

Planning outcomes are not guaranteed. Local planning authorities make final decisions.