Loft conversion in Ealing

Planning permission, real costs and what actually gets approved

Do you need planning permission for a loft conversion in Ealing?

Strong on the Victorian and Edwardian stock of Hanwell, Acton and West Ealing under permitted development outside conservation areas. Inside a conservation area, dormer design is scrutinised through a full application. Building regulations always apply.

Strong on the Victorian and Edwardian stock of Hanwell, Acton and West Ealing; conservation areas scrutinise dormer design.

Rear dormers are a routine space-adder on unconstrained terrace and semi stock across the borough. In the conservation and garden-suburb areas, roof form is tightly controlled — rear-facing, well set-back dormers have a better record than box forms or front alterations. Six conservation areas carry further Article 4 restrictions on householder permitted development, so the address check matters even if you already know you are in a designated area.

CHECK

What actually applies in Ealing

Conservation areas in Ealing

Real · planning.data.gov.uk

Every designated conservation area in Ealing from the official dataset — inside one, permitted development narrows and design scrutiny rises.

  • Acton Green
  • Acton Park
  • Acton Town Centre
  • Bedford Park
  • Brentham Garden Estate
  • Brunswick
  • Canalside, northeast part
  • Canalside, northwest part
  • Canalside, southeast part
  • Canalside, southwest part
  • Churchfields
  • Creffield
  • Cuckoo Estate
  • Ealing Common
  • Ealing Cricket Ground
  • Ealing Green
  • Ealing Town Centre
  • Grange and White Ledges
  • Hanger Hill Garden Estate
  • Hanger Hill, Haymills Estate
  • Hanwell Cemeteries
  • Hanwell Clock Tower
  • Hanwell Village Green
  • Haven Green
  • Mill Hill Park
  • Montpelier Park
  • Mount Park
  • Northolt Village Green
  • Norwood Green
  • Old Oak Lane
  • St Mark's Church and Canal
  • St Stephen's

Source: planning.data.gov.uk · Open Government Licence. Boundaries are checked at address level by the area report.

Article 4 directions in Ealing

Real · planning.data.gov.uk

Ealing's Article 4 directions aren't all in the national planning.data.gov.uk geometry, but the borough operates significant ones: directions made in October 2024 remove the permitted development right to convert a house (C3) into a small HMO (C4) — so an HMO conversion needs planning permission — and six conservation areas carry further Article 4 restrictions on householder permitted development. Check the council's Article 4 pages for the position at a specific address.

Source: planning.data.gov.uk · Open Government Licence · 1 directions recorded. Checked at address level by the area report.

Average house price
£574,490
Annual change
+1.5%

Prices: HM Land Registry UK House Price Index, December 2025 · Open Government Licence.

How often Ealing grants householder applications: 87.7% of householder applications decided were granted (871 of 993) over 2025 Q2 to 2026 Q1 — rank 19 of 33 for lowest grant rate. London average: 85.6%. Householder applications are the class most loft conversions fall under. See the full householder approval-rate league table →
ROUTE

The planning route — PD or permission?

Permitted development (GPDO Class B) allows roof enlargements up to 40m³ on terraced houses and 50m³ on semis and detached — enough for a substantial rear dormer — provided nothing projects beyond the roof plane of the principal elevation, materials are similar, and dormers sit back from the eaves. Class B is excluded in conservation areas.

In conservation areas the route is a full application, and roof form decides it: rear mansards with traditional slate and proportioned dormers have a strong record on Victorian terraces; box dormers and front-facing alterations are the classic refusals. Article 4 directions (Muswell Hill is the local example) pull roof works into planning control even where conservation policy alone might not.

Whatever the route, building regulations approval is always required — fire escape, stair geometry and floor structure — and a Lawful Development Certificate is cheap insurance on PD schemes.

LIMITS

Permitted development limits — loft conversion

Roof volume added — terraced houseUp to 40m³
Roof volume added — semi-detached or detachedUp to 50m³
Principal (street-facing) roof planeNo extension beyond it
DormersSet back from the eaves; materials similar
Conservation areasClass B excluded — full permission
FlatsAlways need permission
Building regulationsAlways required, whatever the planning route

Limits summarise the General Permitted Development Order (Schedule 2, Part 1) as it applies in London. In Ealing, a conservation area, Article 4 direction or listed status changes the route — the panels above show what is designated, and the address check confirms what applies at your property.

COST

How much does a loft conversion cost in Ealing?

Cost per m² (low — rooflight conversion)£3,000
Cost per m² (expected — rear dormer)£3,700
Cost per m² (high — mansard, conservation spec)£4,500+
Typical project (20–28m² with bathroom)£86,000 – £180,000
Professional fees, surveys, party wall (add)8–15% of build

Mansards in conservation areas sit at the top of the range — natural slate, lead detailing and officer negotiation all cost. Ranges calibrated from real project data; VAT excluded.

TIME

Realistic timeline

Design and drawings4–6 weeks
PD route (Lawful Development Certificate)4–8 weeks
Full application (conservation areas)8–12 weeks (8-week statutory target)
Party wall award4–8 weeks (parallel)
Build10–14 weeks
WATCH

What catches people out in Ealing

Headroom and stair position still kill schemes before planning does. On protected streets, oversized box dormers and street-facing changes are the reliable refusals.

DISTRICTS

Postcode districts in Ealing

FAQ

Loft conversion in Ealing, asked straight

01

Do I need planning permission for a loft conversion in Ealing?

Outside conservation areas, many house rear-dormer lofts proceed under permitted development within volume limits. Inside a conservation area — and especially where further Article 4 restrictions apply — expect a full application.
02

How much does a loft conversion cost?

Budget £3,000–£4,500+ per m², or £86,000–£180,000 for a typical 20–28m² conversion with a bathroom, before VAT and fees.
03

What designs get approved in conservation areas?

Rear-facing dormers that leave the principal elevation alone and use appropriate materials. Box dormers and front alterations are classic refusals.
04

Is building regulations approval required?

Always — fire escape, stair geometry and floor structure are controlled either way.
05

Does the small-HMO conversion direction affect loft conversions?

No — that direction is about converting a house to a small HMO, not about roof enlargements for a single household.
CHECK

What applies at your address?

Borough-level rules only narrow it down. Enter a Ealing postcode for the live constraint check — conservation area, Article 4 and sold-price comparables, cited to source.

Need it in writing for one address? A planning permission report for a Ealing property — from £59, or surveyor-reviewed from £295.

Planning Permission Checker provides planning and cost intelligence for early feasibility only. It is not legal, planning, valuation, architectural, structural, or surveying advice. All estimates are indicative and must be verified by qualified professionals before purchase, design, planning submission, or construction.

Cost estimates are indicative only — not a quotation. Final price depends on survey, specification, structure, access, party wall matters, VAT, professional fees, and contractor availability.