DISTRICT

W9 · Maida Vale & Little Venice

Borough coverage

W9's mansion blocks and canal-side villas in Maida Vale and Little Venice are heavily conservation-protected. Roof alterations on the avenues' Italianate terraces face strong design control, while the high proportion of flats means many properties have no permitted development rights to begin with.

Boroughs
Brent, Camden, Kensington and Chelsea, Westminster
Wards spanned
9
Centre
51.5249, -0.1926
Westminster conservation areas
56

Location data: postcodes.io · Constraints: planning.data.gov.uk (borough-level) · Open Government Licence

Constraint context · Westminster

Real · planning.data.gov.uk

Westminster has 56 designated conservation areas and 10 Article 4 areas. A district is too coarse to say which apply to your house — postcode districts span many streets and W9 crosses 4 boroughs. Enter a full postcode below for the point-level check, or read the full borough picture on the Westminster planning guide.

PLANNING
QUESTIONS

Approved guides for W9

CONSERVATION

Is W9 in a conservation area?

Partly — and which part matters. A postcode district is never uniformly designated: W9 contains 9 conservation areas within 1km of its centre, and whether your own property sits inside one decides whether permitted development survives. The centre point of W9 itself does not fall inside one — but many of its streets will.

Aldridge Road Villas And Leamington Road VillasNearby
BayswaterNearby
ColvilleNearby
Maida ValeNearby
Queens Park EstateNearby
QueenswayNearby
South KilburnNearby
St John's WoodNearby
WestbourneNearby

Conservation areas whose official geometry lies within 1km of the centre of W9. Source: planning.data.gov.uk · Open Government Licence. Proximity to the district centre is not a statement about your own address — run the address check for that.

ARTICLE 4

Does an Article 4 direction apply in W9?

Yes — W9 has 11 Article 4 directions mapped within 1km of its centre. An Article 4 direction withdraws specific permitted-development rights on the streets it covers, which is the most common reason a project that looks like permitted development turns out to need a full application. The centre point of W9 falls inside Article 4 Basement Development Permitted Rights Removed.

1-27 Bridstow Place, W2Nearby
1-37 Bristol Gardens, W9Nearby
Article 4 - No 100Nearby
Article 4 - No 101Nearby
Article 4 - No 105Nearby
Article 4 - No 106Nearby
Article 4 Basement Development Permitted Rights RemovedAt the centre
Article 4 Direction Class E To C3 In Central Activities ZoneNearby
Article 4 Direction Class E To C3 Out Central Activity ZoneNearby
Article 4 for HMOsNearby
Queens Park EstateNearby

Article 4 directions whose official geometry lies within 1km of the centre of W9. Source: planning.data.gov.uk · Open Government Licence. The national dataset omits some property-specific directions — the council register is always definitive.

Every designation in the borough: Westminster planning guide →

ROUTE

Do you need planning permission in W9?

Three routes exist, and which one you are on is decided by your address, not your postcode district:

Permitted development — no application. The work stays inside the GPDO limits and no designation removes them. A Lawful Development Certificate is cheap proof for a future buyer.No permission
Prior approval — the larger single-storey rear extension route, with neighbour consultation. Not available on designated land.42 days
Full householder application — required once a designation removes your permitted-development right, or the scheme exceeds the limits.8 weeks

W9 contains mapped conservation-area or Article 4 geometry, so a meaningful share of its streets will have lost some permitted-development rights — which pushes those properties onto the full-application route. Whether yours is one of them is an address-level question, not a district-level one.

FEES

What does planning permission cost in W9?

Householder planning application£548 (from 1 April 2026)
Lawful Development Certificate — proposed works£274 (half the application fee)
Lawful Development Certificate — existing works£548 (the full application fee)
Listed building consentNo fee
Resubmission after a refusalFree once, within 12 months of the decision

National statutory figures for England — councils do not set them, so they are the same in every borough. Planning fees re-index every 1 April; confirm the current amount on the Planning Portal fee calculator before you apply. These are the council's fees only — drawings, surveys and any specialist reports are separate.

TIME

How long does it take?

Householder application — statutory target8 weeks
Householder application — in practice8–12 weeks
Prior approval (larger home extension)42 days
Lawful Development Certificate8 weeks
Householder appeal — deadline to lodge12 weeks from the decision date
Householder appeal — typical decisionAround 18 weeks
REFUSED

What if it's refused?

A refusal is a decision notice with reasons attached, and those reasons are a roadmap. Most homeowners in Westminster — as anywhere in England — are better served by amending the scheme and using the free resubmission than by appealing: you get one further application on the same site within 12 months without paying again.

Who can appealThe applicant only — not neighbours
Fee to appealNone — you bear your own costs
ProcedureWritten representations for most householder appeals
Success rateRoughly a third — about 36% of householder appeals allowed in 2025/26

Appeals go to the Planning Inspectorate, an independent national body. How to read a refusal and choose your route →

PROJECTS

Planning permission by project in Westminster

CHECK

Pinpoint your street

NEARBY

More of Westminster

Planning Permission Checker provides planning and cost intelligence for early feasibility only. It is not legal, planning, valuation, architectural, structural, or surveying advice. All estimates are indicative and must be verified by qualified professionals before purchase, design, planning submission, or construction.

Cost estimates are indicative only — not a quotation. Final price depends on survey, specification, structure, access, party wall matters, VAT, professional fees, and contractor availability.

Planning outcomes are not guaranteed. Local planning authorities make final decisions.

Check an address