DISTRICT

SW20 · Raynes Park & West Wimbledon

Borough coverage

SW20 covers Raynes Park and West Wimbledon, including the Copse Hill and Westcoombe Avenue conservation areas. Much of the Edwardian and interwar stock outside the conservation areas keeps permitted development rights for rear extensions and lofts, with conservation designation the main constraint on visible work.

Boroughs
Kingston upon Thames, Merton
Wards spanned
9
Centre
51.4108, -0.2279
Merton conservation areas
28

Location data: postcodes.io · Constraints: planning.data.gov.uk (borough-level) · Open Government Licence

Constraint context · Merton

Real · planning.data.gov.uk

Merton has 28 designated conservation areas and 0 Article 4 areas. A district is too coarse to say which apply to your house — postcode districts span many streets and SW20 crosses 2 boroughs. Enter a full postcode below for the point-level check, or read the full borough picture on the Merton planning guide.

CONSERVATION

Is SW20 in a conservation area?

Partly — and which part matters. A postcode district is never uniformly designated: SW20 contains 8 conservation areas within 1km of its centre, and whether your own property sits inside one decides whether permitted development survives. The centre point of SW20 itself does not fall inside one — but many of its streets will.

Copse HillNearby
Dennis Park CrescentNearby
Dunmore RoadNearby
Durham RoadNearby
Lambton RoadNearby
Wimbledon ChaseNearby
Wimbledon WestNearby
Wool RoadNearby

Conservation areas whose official geometry lies within 1km of the centre of SW20. Source: planning.data.gov.uk · Open Government Licence. Proximity to the district centre is not a statement about your own address — run the address check for that.

ARTICLE 4

Does an Article 4 direction apply in SW20?

The national dataset holds no Article 4 geometry within 1km of the centre of SW20. Treat that as unknown, not as “none”. The national dataset is known to omit property-specific directions, so the only safe answer is to verify on the council's own register for Merton before assuming a permitted-development right still exists.

Every designation in the borough: Merton planning guide →

ROUTE

Do you need planning permission in SW20?

Three routes exist, and which one you are on is decided by your address, not your postcode district:

Permitted development — no application. The work stays inside the GPDO limits and no designation removes them. A Lawful Development Certificate is cheap proof for a future buyer.No permission
Prior approval — the larger single-storey rear extension route, with neighbour consultation. Not available on designated land.42 days
Full householder application — required once a designation removes your permitted-development right, or the scheme exceeds the limits.8 weeks

SW20 contains mapped conservation-area or Article 4 geometry, so a meaningful share of its streets will have lost some permitted-development rights — which pushes those properties onto the full-application route. Whether yours is one of them is an address-level question, not a district-level one.

FEES

What does planning permission cost in SW20?

Householder planning application£548 (from 1 April 2026)
Lawful Development Certificate — proposed works£274 (half the application fee)
Lawful Development Certificate — existing works£548 (the full application fee)
Listed building consentNo fee
Resubmission after a refusalFree once, within 12 months of the decision

National statutory figures for England — councils do not set them, so they are the same in every borough. Planning fees re-index every 1 April; confirm the current amount on the Planning Portal fee calculator before you apply. These are the council's fees only — drawings, surveys and any specialist reports are separate.

TIME

How long does it take?

Householder application — statutory target8 weeks
Householder application — in practice8–12 weeks
Prior approval (larger home extension)42 days
Lawful Development Certificate8 weeks
Householder appeal — deadline to lodge12 weeks from the decision date
Householder appeal — typical decisionAround 18 weeks
REFUSED

What if it's refused?

A refusal is a decision notice with reasons attached, and those reasons are a roadmap. Most homeowners in Merton — as anywhere in England — are better served by amending the scheme and using the free resubmission than by appealing: you get one further application on the same site within 12 months without paying again.

Who can appealThe applicant only — not neighbours
Fee to appealNone — you bear your own costs
ProcedureWritten representations for most householder appeals
Success rateRoughly a third — about 36% of householder appeals allowed in 2025/26

Appeals go to the Planning Inspectorate, an independent national body. How to read a refusal and choose your route →

PROJECTS

Planning permission by project in Merton

CHECK

Pinpoint your street

NEARBY

More of Merton

Planning Permission Checker provides planning and cost intelligence for early feasibility only. It is not legal, planning, valuation, architectural, structural, or surveying advice. All estimates are indicative and must be verified by qualified professionals before purchase, design, planning submission, or construction.

Cost estimates are indicative only — not a quotation. Final price depends on survey, specification, structure, access, party wall matters, VAT, professional fees, and contractor availability.

Planning outcomes are not guaranteed. Local planning authorities make final decisions.