N22 · Wood Green & Bounds Green
N22 centres on Wood Green's town-centre regeneration area, ringed by Edwardian terraces towards Bounds Green and Alexandra Palace. Outside the Noel Park conservation area — a planned workers' estate with strict Article 4 control — most streets keep permitted development rights.
Location data: postcodes.io · Constraints: planning.data.gov.uk (borough-level) · Open Government Licence
Constraint context · Haringey
Real · planning.data.gov.ukHaringey has 30 designated conservation areas and 24 Article 4 areas. A district is too coarse to say which apply to your house — postcode districts span many streets and N22 crosses 2 boroughs. Enter a full postcode below for the point-level check, or read the full borough picture on the Haringey planning guide.
Is N22 in a conservation area?
Partly — and which part matters. A postcode district is never uniformly designated: N22 contains 7 conservation areas within 1km of its centre, and whether your own property sits inside one decides whether permitted development survives. The centre point of N22 itself falls inside Trinity Gardens.
| 25 | Nearby |
| Bowes Park | Nearby |
| Hornsey Water Works & Filter Beds | Nearby |
| Lordship Lane | Nearby |
| Noel Park | Nearby |
| Trinity Gardens | At the centre |
| Wood Green Common | Nearby |
Conservation areas whose official geometry lies within 1km of the centre of N22. Source: planning.data.gov.uk · Open Government Licence. Proximity to the district centre is not a statement about your own address — run the address check for that.
Does an Article 4 direction apply in N22?
Yes — N22 has 2 Article 4 directions mapped within 1km of its centre. An Article 4 direction withdraws specific permitted-development rights on the streets it covers, which is the most common reason a project that looks like permitted development turns out to need a full application. The centre point of N22 does not fall inside one, but coverage is street-level — verify your own address.
| Borough wide | Nearby |
| Wood Green | Nearby |
Article 4 directions whose official geometry lies within 1km of the centre of N22. Source: planning.data.gov.uk · Open Government Licence. The national dataset omits some property-specific directions — the council register is always definitive.
Every designation in the borough: Haringey planning guide →
Do you need planning permission in N22?
Three routes exist, and which one you are on is decided by your address, not your postcode district:
| Permitted development — no application. The work stays inside the GPDO limits and no designation removes them. A Lawful Development Certificate is cheap proof for a future buyer. | No permission |
| Prior approval — the larger single-storey rear extension route, with neighbour consultation. Not available on designated land. | 42 days |
| Full householder application — required once a designation removes your permitted-development right, or the scheme exceeds the limits. | 8 weeks |
N22 contains mapped conservation-area or Article 4 geometry, so a meaningful share of its streets will have lost some permitted-development rights — which pushes those properties onto the full-application route. Whether yours is one of them is an address-level question, not a district-level one.
What does planning permission cost in N22?
| Householder planning application | £548 (from 1 April 2026) |
| Lawful Development Certificate — proposed works | £274 (half the application fee) |
| Lawful Development Certificate — existing works | £548 (the full application fee) |
| Listed building consent | No fee |
| Resubmission after a refusal | Free once, within 12 months of the decision |
National statutory figures for England — councils do not set them, so they are the same in every borough. Planning fees re-index every 1 April; confirm the current amount on the Planning Portal fee calculator before you apply. These are the council's fees only — drawings, surveys and any specialist reports are separate.
How long does it take?
| Householder application — statutory target | 8 weeks |
| Householder application — in practice | 8–12 weeks |
| Prior approval (larger home extension) | 42 days |
| Lawful Development Certificate | 8 weeks |
| Householder appeal — deadline to lodge | 12 weeks from the decision date |
| Householder appeal — typical decision | Around 18 weeks |
What if it's refused?
A refusal is a decision notice with reasons attached, and those reasons are a roadmap. Most homeowners in Haringey — as anywhere in England — are better served by amending the scheme and using the free resubmission than by appealing: you get one further application on the same site within 12 months without paying again.
| Who can appeal | The applicant only — not neighbours |
| Fee to appeal | None — you bear your own costs |
| Procedure | Written representations for most householder appeals |
| Success rate | Roughly a third — about 36% of householder appeals allowed in 2025/26 |
Appeals go to the Planning Inspectorate, an independent national body. How to read a refusal and choose your route →
Planning permission by project in Haringey
PD carries many schemes in the east; Muswell Hill and Highgate need full applications.
Rear extension in Haringey →Strong precedent in Crouch End and Stroud Green; conservation cores need full applications.
Side return extension in Haringey →The borough's signature project — Edwardian N8/N10 stock converts beautifully, with dormer design decisive.
Loft conversion in Haringey →Hillside topography in Highgate and Muswell Hill adds structural complexity to any excavation.
Basement extension in Haringey →Generous Edwardian gardens in N8/N10 suit larger dual-pitched designs set off the boundary.
Garden room in Haringey →Pinpoint your street
More of Haringey
Two planning worlds: protected west, flexible east.
Borough page →Planning Permission Checker provides planning and cost intelligence for early feasibility only. It is not legal, planning, valuation, architectural, structural, or surveying advice. All estimates are indicative and must be verified by qualified professionals before purchase, design, planning submission, or construction.
Cost estimates are indicative only — not a quotation. Final price depends on survey, specification, structure, access, party wall matters, VAT, professional fees, and contractor availability.
Planning outcomes are not guaranteed. Local planning authorities make final decisions.