DISTRICT

N19 · Archway & Upper Holloway

Borough coverage

N19 climbs from Upper Holloway towards Highgate Hill, straddling the Islington–Haringey boundary. Its late-Victorian terraces support straightforward lofts and rear extensions where streets fall outside conservation areas, with the hillside topography adding structural considerations to basement and lower-ground projects.

Boroughs
Camden, Islington
Wards spanned
6
Centre
51.5653, -0.1300
Islington conservation areas
41

Location data: postcodes.io · Constraints: planning.data.gov.uk (borough-level) · Open Government Licence

Constraint context · Islington

Real · planning.data.gov.uk

Islington has 41 designated conservation areas and 0 Article 4 areas. A district is too coarse to say which apply to your house — postcode districts span many streets and N19 crosses 2 boroughs. Enter a full postcode below for the point-level check, or read the full borough picture on the Islington planning guide.

CONSERVATION

Is N19 in a conservation area?

Partly — and which part matters. A postcode district is never uniformly designated: N19 contains 11 conservation areas within 1km of its centre, and whether your own property sits inside one decides whether permitted development survives. The centre point of N19 itself does not fall inside one — but many of its streets will.

COA00000583Nearby
COA00000604Nearby
COA00000605Nearby
COA00000609Nearby
COA00000610Nearby
COA00000630Nearby
COA00000633Nearby
Crouch EndNearby
Dartmouth ParkNearby
HighgateNearby
Highgate VillageNearby

Conservation areas whose official geometry lies within 1km of the centre of N19. Source: planning.data.gov.uk · Open Government Licence. Proximity to the district centre is not a statement about your own address — run the address check for that.

ARTICLE 4

Does an Article 4 direction apply in N19?

Yes — N19 has 1 Article 4 direction mapped within 1km of its centre. An Article 4 direction withdraws specific permitted-development rights on the streets it covers, which is the most common reason a project that looks like permitted development turns out to need a full application. The centre point of N19 does not fall inside one, but coverage is street-level — verify your own address.

BasementsNearby

Article 4 directions whose official geometry lies within 1km of the centre of N19. Source: planning.data.gov.uk · Open Government Licence. The national dataset omits some property-specific directions — the council register is always definitive.

Every designation in the borough: Islington planning guide →

ROUTE

Do you need planning permission in N19?

Three routes exist, and which one you are on is decided by your address, not your postcode district:

Permitted development — no application. The work stays inside the GPDO limits and no designation removes them. A Lawful Development Certificate is cheap proof for a future buyer.No permission
Prior approval — the larger single-storey rear extension route, with neighbour consultation. Not available on designated land.42 days
Full householder application — required once a designation removes your permitted-development right, or the scheme exceeds the limits.8 weeks

N19 contains mapped conservation-area or Article 4 geometry, so a meaningful share of its streets will have lost some permitted-development rights — which pushes those properties onto the full-application route. Whether yours is one of them is an address-level question, not a district-level one.

FEES

What does planning permission cost in N19?

Householder planning application£548 (from 1 April 2026)
Lawful Development Certificate — proposed works£274 (half the application fee)
Lawful Development Certificate — existing works£548 (the full application fee)
Listed building consentNo fee
Resubmission after a refusalFree once, within 12 months of the decision

National statutory figures for England — councils do not set them, so they are the same in every borough. Planning fees re-index every 1 April; confirm the current amount on the Planning Portal fee calculator before you apply. These are the council's fees only — drawings, surveys and any specialist reports are separate.

TIME

How long does it take?

Householder application — statutory target8 weeks
Householder application — in practice8–12 weeks
Prior approval (larger home extension)42 days
Lawful Development Certificate8 weeks
Householder appeal — deadline to lodge12 weeks from the decision date
Householder appeal — typical decisionAround 18 weeks
REFUSED

What if it's refused?

A refusal is a decision notice with reasons attached, and those reasons are a roadmap. Most homeowners in Islington — as anywhere in England — are better served by amending the scheme and using the free resubmission than by appealing: you get one further application on the same site within 12 months without paying again.

Who can appealThe applicant only — not neighbours
Fee to appealNone — you bear your own costs
ProcedureWritten representations for most householder appeals
Success rateRoughly a third — about 36% of householder appeals allowed in 2025/26

Appeals go to the Planning Inspectorate, an independent national body. How to read a refusal and choose your route →

PROJECTS

Planning permission by project in Islington

CHECK

Pinpoint your street

NEARBY

More of Islington

Planning Permission Checker provides planning and cost intelligence for early feasibility only. It is not legal, planning, valuation, architectural, structural, or surveying advice. All estimates are indicative and must be verified by qualified professionals before purchase, design, planning submission, or construction.

Cost estimates are indicative only — not a quotation. Final price depends on survey, specification, structure, access, party wall matters, VAT, professional fees, and contractor availability.

Planning outcomes are not guaranteed. Local planning authorities make final decisions.

Check an address