IG11 · Barking
IG11 is Barking — the Abbey and Barking Town Centre and Abbey Road and Riverside conservation areas around the abbey ruins. Inside them a full application is the norm; the surrounding stock keeps PD rights, with the borough-wide HMO Article 4 applying across the district.
Location data: postcodes.io · Constraints: planning.data.gov.uk (borough-level) · Open Government Licence
Constraint context · Barking and Dagenham
Real · planning.data.gov.ukBarking and Dagenham has 4 designated conservation areas and 3 Article 4 areas. A district is too coarse to say which apply to your house — postcode districts span many streets and IG11 crosses 3 boroughs. Enter a full postcode below for the point-level check, or read the full borough picture on the Barking and Dagenham planning guide.
Is IG11 in a conservation area?
Partly — and which part matters. A postcode district is never uniformly designated: IG11 contains 1 conservation area within 1km of its centre, and whether your own property sits inside one decides whether permitted development survives. The centre point of IG11 itself does not fall inside one — but many of its streets will.
| Abbey and Barking Town Centre Conservation Area | Nearby |
Conservation areas whose official geometry lies within 1km of the centre of IG11. Source: planning.data.gov.uk · Open Government Licence. Proximity to the district centre is not a statement about your own address — run the address check for that.
Does an Article 4 direction apply in IG11?
Yes — IG11 has 1 Article 4 direction mapped within 1km of its centre. An Article 4 direction withdraws specific permitted-development rights on the streets it covers, which is the most common reason a project that looks like permitted development turns out to need a full application. The centre point of IG11 falls inside HMO Article 4.
| HMO Article 4 | At the centre |
Article 4 directions whose official geometry lies within 1km of the centre of IG11. Source: planning.data.gov.uk · Open Government Licence. The national dataset omits some property-specific directions — the council register is always definitive.
Every designation in the borough: Barking and Dagenham planning guide →
Do you need planning permission in IG11?
Three routes exist, and which one you are on is decided by your address, not your postcode district:
| Permitted development — no application. The work stays inside the GPDO limits and no designation removes them. A Lawful Development Certificate is cheap proof for a future buyer. | No permission |
| Prior approval — the larger single-storey rear extension route, with neighbour consultation. Not available on designated land. | 42 days |
| Full householder application — required once a designation removes your permitted-development right, or the scheme exceeds the limits. | 8 weeks |
IG11 contains mapped conservation-area or Article 4 geometry, so a meaningful share of its streets will have lost some permitted-development rights — which pushes those properties onto the full-application route. Whether yours is one of them is an address-level question, not a district-level one.
What does planning permission cost in IG11?
| Householder planning application | £548 (from 1 April 2026) |
| Lawful Development Certificate — proposed works | £274 (half the application fee) |
| Lawful Development Certificate — existing works | £548 (the full application fee) |
| Listed building consent | No fee |
| Resubmission after a refusal | Free once, within 12 months of the decision |
National statutory figures for England — councils do not set them, so they are the same in every borough. Planning fees re-index every 1 April; confirm the current amount on the Planning Portal fee calculator before you apply. These are the council's fees only — drawings, surveys and any specialist reports are separate.
How long does it take?
| Householder application — statutory target | 8 weeks |
| Householder application — in practice | 8–12 weeks |
| Prior approval (larger home extension) | 42 days |
| Lawful Development Certificate | 8 weeks |
| Householder appeal — deadline to lodge | 12 weeks from the decision date |
| Householder appeal — typical decision | Around 18 weeks |
What if it's refused?
A refusal is a decision notice with reasons attached, and those reasons are a roadmap. Most homeowners in Barking and Dagenham — as anywhere in England — are better served by amending the scheme and using the free resubmission than by appealing: you get one further application on the same site within 12 months without paying again.
| Who can appeal | The applicant only — not neighbours |
| Fee to appeal | None — you bear your own costs |
| Procedure | Written representations for most householder appeals |
| Success rate | Roughly a third — about 36% of householder appeals allowed in 2025/26 |
Appeals go to the Planning Inspectorate, an independent national body. How to read a refusal and choose your route →
Planning permission by project in Barking and Dagenham
Becontree and Dagenham semis extend under PD; the Barking Abbey and Dagenham Village conservation areas need a full application.
Rear extension in Barking and Dagenham →Workable where terraces survive around Barking and Becontree; the conservation areas need a full application.
Side return extension in Barking and Dagenham →A staple on the Becontree and Dagenham stock under PD; the conservation areas scrutinise dormers, and an upward-extension Article 4 can apply.
Loft conversion in Barking and Dagenham →Uncommon on the borough's suburban stock; a full application with structural and ground-condition evidence is expected, plus conservation-area scrutiny.
Basement extension in Barking and Dagenham →The Becontree estate's generous gardens suit garden rooms under PD; the conservation areas can remove outbuilding rights — verify the direction.
Garden room in Barking and Dagenham →Pinpoint your street
More of Barking and Dagenham
Planning Permission Checker provides planning and cost intelligence for early feasibility only. It is not legal, planning, valuation, architectural, structural, or surveying advice. All estimates are indicative and must be verified by qualified professionals before purchase, design, planning submission, or construction.
Cost estimates are indicative only — not a quotation. Final price depends on survey, specification, structure, access, party wall matters, VAT, professional fees, and contractor availability.
Planning outcomes are not guaranteed. Local planning authorities make final decisions.