DISTRICT

HA3 · Wealdstone, Kenton & Harrow Weald

Borough coverage

HA3 runs from Wealdstone and Kenton up to Harrow Weald and the Grimsdyke ridge. Conservation coverage is lighter here than the hilltop, so permitted development carries many rear and loft projects, with the address check confirming whether a designation or Article 4 applies.

Boroughs
Brent, Harrow
Wards spanned
11
Centre
51.5938, -0.3209
Harrow conservation areas
27

Location data: postcodes.io · Constraints: planning.data.gov.uk (borough-level) · Open Government Licence

Constraint context · Harrow

Real · planning.data.gov.uk

Harrow has 27 designated conservation areas and 0 Article 4 areas. A district is too coarse to say which apply to your house — postcode districts span many streets and HA3 crosses 2 boroughs. Enter a full postcode below for the point-level check, or read the full borough picture on the Harrow planning guide.

CONSERVATION

Is HA3 in a conservation area?

No conservation-area geometry from the official dataset falls within 1km of the centre of HA3. That is not a guarantee for your own address — designations are drawn street by street, and the national dataset's coverage varies by borough. Check the exact address before you rely on permitted development.

ARTICLE 4

Does an Article 4 direction apply in HA3?

The national dataset holds no Article 4 geometry within 1km of the centre of HA3. Treat that as unknown, not as “none”. The national dataset is known to omit property-specific directions, so the only safe answer is to verify on the council's own register for Harrow before assuming a permitted-development right still exists.

Every designation in the borough: Harrow planning guide →

ROUTE

Do you need planning permission in HA3?

Three routes exist, and which one you are on is decided by your address, not your postcode district:

Permitted development — no application. The work stays inside the GPDO limits and no designation removes them. A Lawful Development Certificate is cheap proof for a future buyer.No permission
Prior approval — the larger single-storey rear extension route, with neighbour consultation. Not available on designated land.42 days
Full householder application — required once a designation removes your permitted-development right, or the scheme exceeds the limits.8 weeks

No conservation-area or Article 4 geometry from the national dataset falls near the centre of HA3, which makes the permitted-development route more likely here than in designated parts of London — but the dataset omits some property-specific directions, so confirm at your own address before relying on it.

FEES

What does planning permission cost in HA3?

Householder planning application£548 (from 1 April 2026)
Lawful Development Certificate — proposed works£274 (half the application fee)
Lawful Development Certificate — existing works£548 (the full application fee)
Listed building consentNo fee
Resubmission after a refusalFree once, within 12 months of the decision

National statutory figures for England — councils do not set them, so they are the same in every borough. Planning fees re-index every 1 April; confirm the current amount on the Planning Portal fee calculator before you apply. These are the council's fees only — drawings, surveys and any specialist reports are separate.

TIME

How long does it take?

Householder application — statutory target8 weeks
Householder application — in practice8–12 weeks
Prior approval (larger home extension)42 days
Lawful Development Certificate8 weeks
Householder appeal — deadline to lodge12 weeks from the decision date
Householder appeal — typical decisionAround 18 weeks
REFUSED

What if it's refused?

A refusal is a decision notice with reasons attached, and those reasons are a roadmap. Most homeowners in Harrow — as anywhere in England — are better served by amending the scheme and using the free resubmission than by appealing: you get one further application on the same site within 12 months without paying again.

Who can appealThe applicant only — not neighbours
Fee to appealNone — you bear your own costs
ProcedureWritten representations for most householder appeals
Success rateRoughly a third — about 36% of householder appeals allowed in 2025/26

Appeals go to the Planning Inspectorate, an independent national body. How to read a refusal and choose your route →

PROJECTS

Planning permission by project in Harrow

CHECK

Pinpoint your street

NEARBY

More of Harrow

Planning Permission Checker provides planning and cost intelligence for early feasibility only. It is not legal, planning, valuation, architectural, structural, or surveying advice. All estimates are indicative and must be verified by qualified professionals before purchase, design, planning submission, or construction.

Cost estimates are indicative only — not a quotation. Final price depends on survey, specification, structure, access, party wall matters, VAT, professional fees, and contractor availability.

Planning outcomes are not guaranteed. Local planning authorities make final decisions.