DISTRICT

E3 · Bow

Borough coverage

E3 runs from the planned terraces of Tredegar Square and Driffield Road to the Roman Road Market conservation area and Victoria Park's edge. Houses outside the conservation areas can often extend under permitted development; inside them, roofline and materials are scrutinised.

Boroughs
Newham, Tower Hamlets
Wards spanned
10
Centre
51.5281, -0.0248
Tower Hamlets conservation areas
59

Location data: postcodes.io · Constraints: planning.data.gov.uk (borough-level) · Open Government Licence

Constraint context · Tower Hamlets

Real · planning.data.gov.uk

Tower Hamlets has 59 designated conservation areas and 63 Article 4 areas. A district is too coarse to say which apply to your house — postcode districts span many streets and E3 crosses 2 boroughs. Enter a full postcode below for the point-level check, or read the full borough picture on the Tower Hamlets planning guide.

CONSERVATION

Is E3 in a conservation area?

Partly — and which part matters. A postcode district is never uniformly designated: E3 contains 14 conservation areas within 1km of its centre, and whether your own property sits inside one decides whether permitted development survives. The centre point of E3 itself does not fall inside one — but many of its streets will.

Clinton RoadNearby
Driffield RoadNearby
Fairfield RoadNearby
Fish IslandNearby
MedwayNearby
Regents CanalNearby
Roman Road MarketNearby
Ropery StreetNearby
Sugar House LaneNearby
Swaton RoadNearby
Tomlins GroveNearby
Tower Hamlets CemeteryNearby
Tredegar SquareNearby
Victoria ParkNearby

Conservation areas whose official geometry lies within 1km of the centre of E3. Source: planning.data.gov.uk · Open Government Licence. Proximity to the district centre is not a statement about your own address — run the address check for that.

ARTICLE 4

Does an Article 4 direction apply in E3?

Yes — E3 has 8 Article 4 directions mapped within 1km of its centre. An Article 4 direction withdraws specific permitted-development rights on the streets it covers, which is the most common reason a project that looks like permitted development turns out to need a full application. The centre point of E3 does not fall inside one, but coverage is street-level — verify your own address.

Bow RoadNearby
Devon Road 1Nearby
Devon Road 2Nearby
Empson StreetNearby
Mile EndNearby
Mile End RoadNearby
Roman Road EastNearby
Stroudley WalkNearby

Article 4 directions whose official geometry lies within 1km of the centre of E3. Source: planning.data.gov.uk · Open Government Licence. The national dataset omits some property-specific directions — the council register is always definitive.

Every designation in the borough: Tower Hamlets planning guide →

ROUTE

Do you need planning permission in E3?

Three routes exist, and which one you are on is decided by your address, not your postcode district:

Permitted development — no application. The work stays inside the GPDO limits and no designation removes them. A Lawful Development Certificate is cheap proof for a future buyer.No permission
Prior approval — the larger single-storey rear extension route, with neighbour consultation. Not available on designated land.42 days
Full householder application — required once a designation removes your permitted-development right, or the scheme exceeds the limits.8 weeks

E3 contains mapped conservation-area or Article 4 geometry, so a meaningful share of its streets will have lost some permitted-development rights — which pushes those properties onto the full-application route. Whether yours is one of them is an address-level question, not a district-level one.

FEES

What does planning permission cost in E3?

Householder planning application£548 (from 1 April 2026)
Lawful Development Certificate — proposed works£274 (half the application fee)
Lawful Development Certificate — existing works£548 (the full application fee)
Listed building consentNo fee
Resubmission after a refusalFree once, within 12 months of the decision

National statutory figures for England — councils do not set them, so they are the same in every borough. Planning fees re-index every 1 April; confirm the current amount on the Planning Portal fee calculator before you apply. These are the council's fees only — drawings, surveys and any specialist reports are separate.

TIME

How long does it take?

Householder application — statutory target8 weeks
Householder application — in practice8–12 weeks
Prior approval (larger home extension)42 days
Lawful Development Certificate8 weeks
Householder appeal — deadline to lodge12 weeks from the decision date
Householder appeal — typical decisionAround 18 weeks
REFUSED

What if it's refused?

A refusal is a decision notice with reasons attached, and those reasons are a roadmap. Most homeowners in Tower Hamlets — as anywhere in England — are better served by amending the scheme and using the free resubmission than by appealing: you get one further application on the same site within 12 months without paying again.

Who can appealThe applicant only — not neighbours
Fee to appealNone — you bear your own costs
ProcedureWritten representations for most householder appeals
Success rateRoughly a third — about 36% of householder appeals allowed in 2025/26

Appeals go to the Planning Inspectorate, an independent national body. How to read a refusal and choose your route →

PROJECTS

Planning permission by project in Tower Hamlets

CHECK

Pinpoint your street

NEARBY

More of Tower Hamlets

Planning Permission Checker provides planning and cost intelligence for early feasibility only. It is not legal, planning, valuation, architectural, structural, or surveying advice. All estimates are indicative and must be verified by qualified professionals before purchase, design, planning submission, or construction.

Cost estimates are indicative only — not a quotation. Final price depends on survey, specification, structure, access, party wall matters, VAT, professional fees, and contractor availability.

Planning outcomes are not guaranteed. Local planning authorities make final decisions.

Check an address