DA5 · Bexley & Old Bexley
DA5 is Old Bexley — the historic village conservation area on the Cray, with Hall Place nearby and North Cray Village beyond. Inside the conservation areas a full application is the norm; much of the surrounding stock keeps PD rights, with the borough-wide HMO Article 4 (since 2017) applying throughout.
Location data: postcodes.io · Constraints: planning.data.gov.uk (borough-level) · Open Government Licence
Constraint context · Bexley
Real · planning.data.gov.ukBexley has 31 designated conservation areas and 0 Article 4 areas. A district is too coarse to say which apply to your house — postcode districts span many streets and DA5 crosses 2 boroughs. Enter a full postcode below for the point-level check, or read the full borough picture on the Bexley planning guide.
Is DA5 in a conservation area?
Partly — and which part matters. A postcode district is never uniformly designated: DA5 contains 3 conservation areas within 1km of its centre, and whether your own property sits inside one decides whether permitted development survives. The centre point of DA5 itself does not fall inside one — but many of its streets will.
| North Cray Village | Nearby |
| Old Bexley | Nearby |
| Parkhurst | Nearby |
Conservation areas whose official geometry lies within 1km of the centre of DA5. Source: planning.data.gov.uk · Open Government Licence. Proximity to the district centre is not a statement about your own address — run the address check for that.
Does an Article 4 direction apply in DA5?
The national dataset holds no Article 4 geometry within 1km of the centre of DA5. Treat that as unknown, not as “none”. The national dataset is known to omit property-specific directions, so the only safe answer is to verify on the council's own register for Bexley before assuming a permitted-development right still exists.
Every designation in the borough: Bexley planning guide →
Do you need planning permission in DA5?
Three routes exist, and which one you are on is decided by your address, not your postcode district:
| Permitted development — no application. The work stays inside the GPDO limits and no designation removes them. A Lawful Development Certificate is cheap proof for a future buyer. | No permission |
| Prior approval — the larger single-storey rear extension route, with neighbour consultation. Not available on designated land. | 42 days |
| Full householder application — required once a designation removes your permitted-development right, or the scheme exceeds the limits. | 8 weeks |
DA5 contains mapped conservation-area or Article 4 geometry, so a meaningful share of its streets will have lost some permitted-development rights — which pushes those properties onto the full-application route. Whether yours is one of them is an address-level question, not a district-level one.
What does planning permission cost in DA5?
| Householder planning application | £548 (from 1 April 2026) |
| Lawful Development Certificate — proposed works | £274 (half the application fee) |
| Lawful Development Certificate — existing works | £548 (the full application fee) |
| Listed building consent | No fee |
| Resubmission after a refusal | Free once, within 12 months of the decision |
National statutory figures for England — councils do not set them, so they are the same in every borough. Planning fees re-index every 1 April; confirm the current amount on the Planning Portal fee calculator before you apply. These are the council's fees only — drawings, surveys and any specialist reports are separate.
How long does it take?
| Householder application — statutory target | 8 weeks |
| Householder application — in practice | 8–12 weeks |
| Prior approval (larger home extension) | 42 days |
| Lawful Development Certificate | 8 weeks |
| Householder appeal — deadline to lodge | 12 weeks from the decision date |
| Householder appeal — typical decision | Around 18 weeks |
What if it's refused?
A refusal is a decision notice with reasons attached, and those reasons are a roadmap. Most homeowners in Bexley — as anywhere in England — are better served by amending the scheme and using the free resubmission than by appealing: you get one further application on the same site within 12 months without paying again.
| Who can appeal | The applicant only — not neighbours |
| Fee to appeal | None — you bear your own costs |
| Procedure | Written representations for most householder appeals |
| Success rate | Roughly a third — about 36% of householder appeals allowed in 2025/26 |
Appeals go to the Planning Inspectorate, an independent national body. How to read a refusal and choose your route →
Planning permission by project in Bexley
Bexleyheath, Sidcup and Erith semis extend routinely under PD; Old Bexley and the conservation areas need a full application.
Rear extension in Bexley →Workable where Victorian terraces survive in Erith and Bexleyheath; conservation designation decides PD versus a full application.
Side return extension in Bexley →Routine on the Bexleyheath and Sidcup semis under PD; the conservation areas scrutinise dormers.
Loft conversion in Bexley →Uncommon on the borough's suburban stock; a full application with structural and ground-condition evidence is expected, plus conservation-area scrutiny.
Basement extension in Bexley →Large suburban gardens in Bexleyheath and Sidcup suit garden rooms under PD; conservation areas are where outbuilding rights tighten.
Garden room in Bexley →Pinpoint your street
More of Bexley
Old Bexley to the Erith riverside; a borough-wide HMO Article 4 since 2017.
Borough page →Planning Permission Checker provides planning and cost intelligence for early feasibility only. It is not legal, planning, valuation, architectural, structural, or surveying advice. All estimates are indicative and must be verified by qualified professionals before purchase, design, planning submission, or construction.
Cost estimates are indicative only — not a quotation. Final price depends on survey, specification, structure, access, party wall matters, VAT, professional fees, and contractor availability.