DISTRICT

BR6 · Orpington, Farnborough & Chelsfield

Borough coverage

BR6 reaches the Farnborough Village and Chelsfield conservation areas and the rural Green Belt around Downe and Cudham, where new building is tightly restricted. Suburban Orpington keeps permitted development rights for many projects; Green Belt and conservation status are the constraints that decide the rest.

Boroughs
Bromley, Sevenoaks
Wards spanned
9
Centre
51.3651, 0.0912
Bromley conservation areas
69

Location data: postcodes.io · Constraints: planning.data.gov.uk (borough-level) · Open Government Licence

Constraint context · Bromley

Real · planning.data.gov.uk

Bromley has 69 designated conservation areas and 0 Article 4 areas. A district is too coarse to say which apply to your house — postcode districts span many streets and BR6 crosses 2 boroughs. Enter a full postcode below for the point-level check, or read the full borough picture on the Bromley planning guide.

CONSERVATION

Is BR6 in a conservation area?

No conservation-area geometry from the official dataset falls within 1km of the centre of BR6. That is not a guarantee for your own address — designations are drawn street by street, and the national dataset's coverage varies by borough. Check the exact address before you rely on permitted development.

ARTICLE 4

Does an Article 4 direction apply in BR6?

The national dataset holds no Article 4 geometry within 1km of the centre of BR6. Treat that as unknown, not as “none”. The national dataset is known to omit property-specific directions, so the only safe answer is to verify on the council's own register for Bromley before assuming a permitted-development right still exists.

Every designation in the borough: Bromley planning guide →

ROUTE

Do you need planning permission in BR6?

Three routes exist, and which one you are on is decided by your address, not your postcode district:

Permitted development — no application. The work stays inside the GPDO limits and no designation removes them. A Lawful Development Certificate is cheap proof for a future buyer.No permission
Prior approval — the larger single-storey rear extension route, with neighbour consultation. Not available on designated land.42 days
Full householder application — required once a designation removes your permitted-development right, or the scheme exceeds the limits.8 weeks

No conservation-area or Article 4 geometry from the national dataset falls near the centre of BR6, which makes the permitted-development route more likely here than in designated parts of London — but the dataset omits some property-specific directions, so confirm at your own address before relying on it.

FEES

What does planning permission cost in BR6?

Householder planning application£548 (from 1 April 2026)
Lawful Development Certificate — proposed works£274 (half the application fee)
Lawful Development Certificate — existing works£548 (the full application fee)
Listed building consentNo fee
Resubmission after a refusalFree once, within 12 months of the decision

National statutory figures for England — councils do not set them, so they are the same in every borough. Planning fees re-index every 1 April; confirm the current amount on the Planning Portal fee calculator before you apply. These are the council's fees only — drawings, surveys and any specialist reports are separate.

TIME

How long does it take?

Householder application — statutory target8 weeks
Householder application — in practice8–12 weeks
Prior approval (larger home extension)42 days
Lawful Development Certificate8 weeks
Householder appeal — deadline to lodge12 weeks from the decision date
Householder appeal — typical decisionAround 18 weeks
REFUSED

What if it's refused?

A refusal is a decision notice with reasons attached, and those reasons are a roadmap. Most homeowners in Bromley — as anywhere in England — are better served by amending the scheme and using the free resubmission than by appealing: you get one further application on the same site within 12 months without paying again.

Who can appealThe applicant only — not neighbours
Fee to appealNone — you bear your own costs
ProcedureWritten representations for most householder appeals
Success rateRoughly a third — about 36% of householder appeals allowed in 2025/26

Appeals go to the Planning Inspectorate, an independent national body. How to read a refusal and choose your route →

PROJECTS

Planning permission by project in Bromley

CHECK

Pinpoint your street

NEARBY

More of Bromley

Planning Permission Checker provides planning and cost intelligence for early feasibility only. It is not legal, planning, valuation, architectural, structural, or surveying advice. All estimates are indicative and must be verified by qualified professionals before purchase, design, planning submission, or construction.

Cost estimates are indicative only — not a quotation. Final price depends on survey, specification, structure, access, party wall matters, VAT, professional fees, and contractor availability.

Planning outcomes are not guaranteed. Local planning authorities make final decisions.

Check an address